DaleelKey

[museum] accent: #f0b429 progress: 82 status: Commercial traction problem: Cement blocks are heavy and slow to install, insulate poorly, and carry a high carbon footprint — while Palestine depends on costly imported cement. solution: DKG locally-made gypsum block systems for interior walls — faster and lighter to build with, fire-rated, and far lower in embodied carbon. statusNow: Commercial traction — supplying real projects with repeat orders; BS EN 12859:2011 certified. metrics: 3-4x | Faster install ;; 85% | Less CO2 ;; EI 120 | Fire rated deck: https://www.technopark.ps/public/files/image/hive/daleelkey/deck;;10;;jpg [/museum]